Try the calculator
First-pass estimate — confirm final quantities against your engineer's design.
Concrete volume
1.27m³
Cement
11bags
Steel
201kg
Indicative cost
₹ 17,245
Live estimate · Prices indicative for Guna district (2026)
Key points
- Steel assumed 2.0% of beam volume for residential sections.
Formula & how it works
Beam volume = W × D × L (metres).
Steel = volume × 2.0% × 7850.
Worked example
- Beam 9" × 12" × 60 ft → ≈ 1.26 m³ concrete, ≈ 198 kg steel.
Expert tips & mistakes to avoid
- Always add a 5–7% wastage buffer — mid-slab shortages cost more than the buffer bags.
- For engineered members (RCC columns/beams), follow the structural drawing over any calculator.
- Order cement in tranches — bags older than 90 days lose strength.
- Confirm the current market rate on WhatsApp before finalising the budget — prices printed here are indicative only.
Frequently asked questions
Do I always need beams?
+
Framed structures use beams to transfer slab load to columns. Load-bearing masonry buildings use lintels instead of beams.