Try the calculator
First-pass estimate — confirm final quantities against your engineer's design.
Approx. total budget
₹ 14,00,000
Material
₹ 7,00,000
Labour
₹ 3,20,000
Finishing & fittings
₹ 3,80,000
Effective rate / sq ft
₹ 1,400 / sq ft
Live estimate · Prices indicative for Guna district (2026)
Key points
- Uses per-sq-ft benchmarks that vary by finish quality.
- Rates indicative for Guna district; confirm against BOQ.
Formula & how it works
Total = built-up area × (material ₹/sqft + labour ₹/sqft + finishing ₹/sqft).
Finish tier changes the finishing rate only.
Worked example
- 1000 sq ft × 1 floor, Standard finish.
- Material ≈ ₹7 L, labour ≈ ₹3.2 L, finishing ≈ ₹4 L → total ≈ ₹14 L.
Expert tips & mistakes to avoid
- Always add a 5–7% wastage buffer — mid-slab shortages cost more than the buffer bags.
- For engineered members (RCC columns/beams), follow the structural drawing over any calculator.
- Order cement in tranches — bags older than 90 days lose strength.
- Confirm the current market rate on WhatsApp before finalising the budget — prices printed here are indicative only.
Frequently asked questions
Does this include land cost?
+
No — only construction. Land / plot cost is separate.
How accurate is this?
+
±15% for a typical Chachaura-tehsil house. For a firm number, share your drawing with us for a BOQ-based estimate.
Ready to order?
Send us the calculator results — we'll confirm today's rate for cement, TMT and delivery within 30 minutes during shop hours.